Opportunity timeline

PostedAug 26, 2026
DeadlineSep 25, 2026

In plain English

The Navy wants a contractor to repair and upgrade fuse-hydraulic aircraft components, part number 7RH 1680 015855015 P8, using the specified drawings and technical publications. The work includes inspection, component repair or replacement, reassembly, testing, and return to ready-for-issue condition. Repairs must be completed within 365 days after each asset is received, and the contractor must provide its monthly repair capacity and required tooling, labor, materials, and facility.

About this opportunity

Repair Turnaround Time (RTAT) definition: The contractual delivery requirementis measured from asset Return to the date of asset acceptance under the termsof the contract. For purposes of this section, Return is defined as physicalreceipt of the F-condition asset at the contractor's facility as reflected inthe Action Date entry in the Commercial Asset Visibility (CAV) system. Inaccordance with the CAV Statement of Work, the contractor is required toaccurately report all transactions by the end of the fifth regular businessday after receipt and the Action Date entered in CAV must be dated to reflectthe actual date of physical receipt. The Contractor must obtain final inspection and…

Time remaining

Closes Sep 25, 2026

11Days
:
12Hours
:
47Min
:
08Sec

Related Opportunities

Bid details are gathered and summarized automatically. Please verify details at the original source.

Ref No.

BS-479B12