Opportunity timeline

PostedAug 26, 2026
DeadlineSep 21, 2026

In plain English

The government wants maintenance and replacement work for sidewalks, curb ramps, driveways, and curbs along West Fuqua Street in Houston, from west of Bathurst Street to Almeda Road (FM 521). Work also includes vegetation trimming, imprinted sidewalk poetry, traffic control, stormwater pollution prevention measures, and tree protection. Plans, addenda, and bidding are managed through CivCast.

About this opportunity

The project is located within the City of Houston right-of-way along West Fuqua Street, generally along the north side of the westbound lanes from west of Bathurst Street to Almeda Road (FM 521), as shown in the construction plans. The project scope includes the removal and replacement of existing concrete sidewalks, curb ramps, driveways, and curbs as identified by the Engineer in the field; trimming of trees and/or shrubs within the right-of-way; installation of imprinted sidewalk poetry as identified in the Project Manual; traffic control; SW3P measures; and tree protection. Posted by Huitt Zollars, Inc on behalf of TIRZ 25 Hiram Clarke Fort Bend Redevelopment Authority. Sourced from…

Time remaining

Closes Sep 21, 2026

07Days
:
09Hours
:
45Min
:
24Sec

Related Opportunities

Bid details are gathered and summarized automatically. Please verify details at the original source.

Ref No.

BS-8F0045