Opportunity timeline
In plain English
The government wants maintenance and replacement work for sidewalks, curb ramps, driveways, and curbs along West Fuqua Street in Houston, from west of Bathurst Street to Almeda Road (FM 521). Work also includes vegetation trimming, imprinted sidewalk poetry, traffic control, stormwater pollution prevention measures, and tree protection. Plans, addenda, and bidding are managed through CivCast.
About this opportunity
The project is located within the City of Houston right-of-way along West Fuqua Street, generally along the north side of the westbound lanes from west of Bathurst Street to Almeda Road (FM 521), as shown in the construction plans. The project scope includes the removal and replacement of existing concrete sidewalks, curb ramps, driveways, and curbs as identified by the Engineer in the field; trimming of trees and/or shrubs within the right-of-way; installation of imprinted sidewalk poetry as identified in the Project Manual; traffic control; SW3P measures; and tree protection. Posted by Huitt Zollars, Inc on behalf of TIRZ 25 Hiram Clarke Fort Bend Redevelopment Authority. Sourced from…
Time remaining
Closes Sep 21, 2026
Related Opportunities

Cardio-Pulmonary Booms

1st Qtr. Bread FY27 - FDC Houston

Certification of Sterile Compounding Facilities Services

1ST QTR FY27- Milk - FDC Houston

Forklift
Bid details are gathered and summarized automatically. Please verify details at the original source.
Ref No.
BS-8F0045

