Opportunity timeline

PostedAug 24, 2026
DeadlineNov 20, 2026

In plain English

The Navy wants a contractor to repair or overhaul E-2/C-2 aircraft rudder assemblies, outboard lower, for both left- and right-hand versions. The work includes cleaning, inspection, assembly, testing, and a first-article inspection at the contractor’s facility, with DCMA and FST present. Contractors must propose a repair turnaround time and monthly repair capacity; early and partial deliveries are preferred.

About this opportunity

This requirement is for the repair of the items herein thissolicitation. Repair Turnaround Time (RTAT) definition: The contractual delivery requirement is measured from asset Return to the date of asset acceptance under the terms of the contract. For purposes of this section, Return is defined as physical receipt of the F-condition asset at the contractor?s facility as reflected in the Action Date entry in the Commercial Asset Visibility (CAV) system. In accordance with the CAV Statement of Work, the contractor is required to accurately report all transactions by the end of the fifth regular business day after receipt and the Action Date entered in CAV must be dated to reflect the actual…

Time remaining

Closes Nov 20, 2026

67Days
:
08Hours
:
03Min
:
07Sec

Related Opportunities

Bid details are gathered and summarized automatically. Please verify details at the original source.

Ref No.

BS-EE75B2