Opportunity timeline

PostedAug 21, 2026
DeadlineSep 24, 2026

In plain English

The City of Plant City wants an annual contract for trenchless cured-in-place pipe lining of existing gravity sewer mains. Work may include lining, point repairs, reconnecting sewer laterals, preparation, and restoration across the city’s wastewater system, which includes about 160 miles of mains ranging from 8 to 36 inches in diameter.

About this opportunity

The City of Plant City owns and operates an extensive wastewater collection system consisting of approximately 160 miles of gravity sewer mains, ranging in diameter from 8 inches to 36 inches, and 4‑inch and 6‑inch sewer laterals. Maintaining the integrity and performance of this aging infrastructure is essential to ensuring reliable wastewater conveyance, minimizing inflow and infiltration (I I), and meeting evolving regulatory requirements. To support compliance with Rule 62-600.705(2), F.A.C. and to advance the City’s long‑term asset management goals, the City of Plant City intends to establish an annual contract for cured‑in‑place pipe (CIPP) lining services. The selected contractor(s)…

Time remaining

Closes Sep 24, 2026

10Days
:
10Hours
:
01Min
:
38Sec

Related Opportunities

Bid details are gathered and summarized automatically. Please verify details at the original source.

Ref No.

BS-CA90C1