Opportunity timeline
In plain English
The City of Palo Alto Utilities Department wants a qualified contractor to repair oil leaks on Transformer 21 at the Colorado Substation. Work includes testing, partial oil draining and storage, secondary bushing gasket replacement, pressure testing, oil processing and refilling, and final documentation. The contractor must provide all labor, equipment, materials, transportation, and disposal services.
About this opportunity
The City of Palo Alto Utilities Department requires a qualified contractor to perform the removal and replacement of the gaskets on the secondary bushings of Transformer 21 at the Colorado Substation. The selected contractor shall furnish all labor, supervision, tools, equipment, materials, oil processing equipment, oil storage tanker with containment berm, testing instruments, safety equipment, transportation, hauling, disposal, and incidentals necessary to complete secondary bushing re-gasketing work on Transformer 21 at Colorado Substation. The work generally consists of pre-testing, partial draining and storage of non-PCB mineral oil, gasket replacement at the bushing flanges and any…
Time remaining
Closes Sep 23, 2026
Related Opportunities

BULK OXYGEN (Base+4 Option)

USNS Alan Shepard - Chill Water Valve

Seat ASM - Driver's, Recaro ERGO METRO AM384

Door ASM - Access, Defroster

Filter - Driver's Heater/defroster, Fresh Air (BUSES 5600-5850 Only)
Bid details are gathered and summarized automatically. Please verify details at the original source.
Ref No.
BS-856A5A


