Opportunity timeline

PostedAug 22, 2026
DeadlineSep 23, 2026

In plain English

The City of League City wants to rehabilitate the influent lift station at the Dallas Salmon Wastewater Treatment Plant. Work includes temporary bypass pumping, wet-well cleaning and concrete repairs, H2S-resistant coatings, new flood-resistant hatches and vents, and replacement stainless-steel piping and supports. Plans, addenda, and bidding are managed through CivCast.

About this opportunity

The project consists of the following scope of work: Installation of bypass pumping systems as required on the influent gravity raw sewage collection sewers. Connection to existing SCADA system for temporary equipment notification. Removal of existing submersible pumps and proper storage. Reinstall submersible pumps and connect electrical cables upon completion of rehabilitation work. Blast cleaning and pressure wash cleaning of all wet wells in preparation for structural repair methods. Dewatering and drying of existing wet wells. Inspect existing pump base elbows. Installation of additional reinforcing steel and buildup of lower concrete walls. Repair of upper concrete walls and roof…

Time remaining

Closes Sep 23, 2026

09Days
:
09Hours
:
04Min
:
43Sec

Related Opportunities

Bid details are gathered and summarized automatically. Please verify details at the original source.

Ref No.

BS-61155F