Opportunity timeline

PostedAug 21, 2026
DeadlineSep 14, 2026

In plain English

The U.S. Army Corps of Engineers wants two culvert valve assemblies removed, fabricated, delivered, and installed at Cannelton Lock and Dam in Cannelton, Indiana. Work also includes unwatering and rewatering the valve chamber and maintaining it unwatered during installation. The project is valued at $5 million to $10 million and is limited to MATOC contractors under the referenced contracts; proposals are due by 11:00 a.m. EDT on September 14, 2026, after an amendment revised the original date.

About this opportunity

Dear MATOC Contractors:Reference is made to your Indefinite Delivery Indefinite Quantity Contracts, NumbersW911WN23D0001 through W911WN23D0007, to provide varying types of Fabrication of parts and Refurbishment Services for the U.S. Army Corps of Engineers, Great Lakes and Ohio RiverMission Boundaries primarily for Civil projects.We request you submit a price proposal for work to be completed in the base bid that includes, but is not limited to, removal of two (2) culvert valve assemblies, fabrication and delivery of two(2) culvert valve assemblies, and installation of two (2) culvert valve assemblies located on theriver wall of the main lock chamber (1200 ft chamber) at Cannelton Lock and…

Time remaining

Closes Sep 14, 2026

00Days
:
06Hours
:
41Min
:
20Sec

Bid details are gathered and summarized automatically. Please verify details at the original source.

Ref No.

BS-360D86