Opportunity timeline
In plain English
The government wants a contractor to renovate the Brinson-Perry Dog Park. Work includes demolition and disposal, site grading, a masonry retaining wall, new chain-link fencing, a 240-square-foot shade pavilion, refurbishment of two water guzzlers, and new landscaping. Construction must follow the engineered plans and specifications prepared by K2M Design and MPA.
About this opportunity
The renovation of the Brinson-Perry Dog park project consists of the demolition, fill dirt removal and disposal, earth leveling and regrading of the construction site and legal disposal of the existing dog park materials per the demolition plans provided, construction of the new dog park - installation of a masonry retaining wall, new chain link fencing, 240 square foot shade pavilion, refurbishing of the existing water guzzlers (2), demo, removal and installation of new landscaping. The new dog park shall be in accordance with engineered plans, specifications, and construction documents prepared by K2M Design and MPA. Posted by Villages Community Development Districts, FL on OpenGov…
Time remaining
Closes Sep 22, 2026
Related Opportunities

City Sidewalk Project

FY27-GED and Abe Educational Software for Highschool Equivalency and TABE Preparation

FY27 SIR-Spheres Y90 Resin Microspheres

Fiber Optic Spring Hill Drive - 112251

Radiator CAC ASM (13-15)
Bid details are gathered and summarized automatically. Please verify details at the original source.
Ref No.
BS-976330


