Opportunity timeline
In plain English
The City of Woodstock wants a qualified contractor to build a 10-foot trail connection from Dupree Road to the Noonday Creek Trail. Work includes demolishing and hauling away the house at 132 Dupree Road, removing three driveways at 128, 130, and 132 Dupree Road, and installing sidewalk, stormwater drainage, and concrete ditch paving. An optional virtual pre-bid meeting is scheduled for August 27, 2026, at 3:30 p.m. ET.
About this opportunity
The City of Woodstock, Georgia, herein referred to as the 'City', is accepting bids from qualified contractors for the purpose of construction of a 10' trail connection from Dupree Road and to the Noonday Creek Trail. In order to construct the trail, the house at 132 Dupree Road will be demolished and hauled off, along with the three Driveways at 128, 130, 132 Dupree Rd, hereinafter referred to as the 'project'. This includes but is not limited to concrete sidewalk, stormwater drainage and Concrete ditch paving Pre-bid meeting (attendance optional): Aug 27, 2026 @ 03:30 PM ET at Virtual. Point of contact: Martyn Detz ([email protected]). Event PE-62853-NONST-2027-000000029 on the…
Time remaining
Closes Sep 22, 2026
Related Opportunities

Refrigeration Service for LDC at Fort Stewart, GA

Facility Assessment

Facility Condition Assessment

Fire Alarm Maintenance and Inspection

Bid No. 27003-2001, Union Park Pavilion Phase II
Bid details are gathered and summarized automatically. Please verify details at the original source.
Ref No.
BS-9C3C51

