Opportunity timeline

PostedAug 20, 2026
DeadlineSep 22, 2026

In plain English

The City of Woodstock is seeking qualified contractors to build an 8-foot multi-use trail and stormwater improvements along Rope Mill Road, from Inwood Walk North to across from Camelia Place. Work also includes a traffic-calming island, sidewalk, road widening, curbs and gutters, drainage structures, driveway reconstruction, and thermoplastic striping. An optional virtual pre-bid meeting is scheduled for August 27, 2026, at 3:00 p.m. ET.

About this opportunity

The City of Woodstock, Georgia, herein referred to as the City, is accepting bids from qualified contractors for the purpose of constructing an 8-foot multi-use trail & stormwater drainage improvements along Rope Mill Road from Inwood Walk North to across from Camelia Place, as well as a traffic calming island, hereinafter referred to as the 'Project'. This includes but is not limited to concrete sidewalk installation, road widening, curb & gutter, storm drainpipe, catch basins, driveway reconstruction and thermoplastic striping. Pre-bid meeting (attendance optional): Aug 27, 2026 @ 03:00 PM ET at Virtual. Point of contact: Martyn Detz ([email protected]). Event…

Time remaining

Closes Sep 22, 2026

08Days
:
08Hours
:
37Min
:
38Sec

Related Opportunities

Bid details are gathered and summarized automatically. Please verify details at the original source.

Ref No.

BS-B9DD92