The City of Hollywood wants to improve drainage near Johnson Street and I-95. Work includes raising the FDOT ditch bank, re-grading the ditch, and installing a large culvert under Johnson Street with a canal connecting to the city drainage system in Sunset Park. The project is identified as Project No. 24-11064.
About this opportunity
The interim project concept consists of: · Raising the top of bank of the FDOT I-95 ditch along its eastern perimeter at a height sufficient to contain the runoff from exiting the ditch into the neighborhood (approx. 5 ft-NAVD.) · Re-grading the FDOT ditch in between the trees south of Johnson to provide some additional storage and conveyance path to the north to the new culvert. · Installing a new equivalent large culvert under Johnson Street and a canal to provide a positive outfall from the FDOT I-95 ditch to the City’s drainage system in the Sunset Park area. Posted by City of Hollywood on OpenGov Procurement. Sourced from OpenGov Procurement, where plans, addenda,…
Time remaining
Closes Sep 22, 2026
Related Opportunities

City Sidewalk Project

FY27-GED and Abe Educational Software for Highschool Equivalency and TABE Preparation

FY27 SIR-Spheres Y90 Resin Microspheres

Fiber Optic Spring Hill Drive - 112251

Radiator CAC ASM (13-15)
Bid details are gathered and summarized automatically. Please verify details at the original source.
Ref No.
BS-209A34