Opportunity timeline
In plain English
The Department of Veterans Affairs wants construction and alterations to the existing chiller plant at the Northport medical facility. The work will occur in two phases and includes installing and maintaining a temporary chiller plant so the facility remains operational until the new system is started and accepted.
About this opportunity
Work includes general construction and alterations, of the existing chiller plant and includes the necessary removal of existing building components, systems, construction and installation of certain other items. The project will be constructed in two phases. Phase 1 work shall be completed and fully operational, supporting the medical facility, before a notice to proceed with phase 2 work will be issued. The project includes the installation and maintenance of a temporary chiller plant to support the Medical Facility during construction. All temporary installations shall remain in service until the end of the project’s startup of the new chiller plant and final acceptance.
Time remaining
Closes Sep 15, 2026
Related Opportunities

Seismic Retrofit of the Historic Union Station in Tacoma, WA

Wichita VA Medical Center Campus Wayfinding Signage

Wichita VA Medical Center Campus Wayfinding Signage

589A7-23-306 Renovate Bldg. 5 & 5B for Mental Health FY27 NRM

East Campus Unclassified Modular Facility, Fort George G. MEADE, MD
Bid details are gathered and summarized automatically. Please verify details at the original source.
Ref No.
BS-ABB993

