Opportunity timeline

PostedAug 19, 2026
DeadlineSep 30, 2026

In plain English

Springfield Water and Sewer Commission is seeking a contractor to remove and replace the 45-ton crane at the Cobble Mountain Hydroelectric powerhouse. The replacement will use the existing runway and rail with minor modifications, and the project is estimated not to exceed $500,000. This is a rebid of IFB No. 26-28; bids are submitted through COMMBUYS with a free sign-in.

About this opportunity

The Cobble Mountain Hydroelectric powerhouse crane is a double girder, top running bridge crane with a single main hook of 45-ton rated capacity. The existing crane shall be removed and replaced and will operate on the existing runway and rail with minor modifications. The Project is estimated to not exceed $500,000. This is a REBID of IFB No 26-28. Point of contact: Edward Sweeney ([email protected]). Solicitation BD-27-1531-SWSPD-SWSPD-132622 from Springfield Water and Sewer Commission. Full documents and how to quote are on COMMBUYS, the Commonwealth of Massachusetts procurement portal (viewing is public; quoting needs a free COMMBUYS sign-in).

Time remaining

Closes Sep 30, 2026

16Days
:
12Hours
:
37Min
:
47Sec

Related Opportunities

Bid details are gathered and summarized automatically. Please verify details at the original source.

Ref No.

BS-608234