Opportunity timeline

PostedAug 18, 2026
DeadlineSep 23, 2026

In plain English

The City of Key West wants a contractor to permit and build a second stormwater injection well at an existing pump station. Work includes drilling, well casing and piping, two 24-inch plug valves in new concrete vaults, connection piping, erosion controls, traffic maintenance, and restoration of pavement, shoulder, and sidewalk. Bid documents and responses are handled through the DemandStar listing; a free vendor account is required.

About this opportunity

The project consists of permitting and construction of a 2nd stormwater injection well at an existing stormwater pump station; installing well casing and well head piping with air valve in manhole; remove and replace two 24” isolating plug valves in new concrete vaults; new 24” spool and other connection piping, and surface restoration to include asphalt pavement, unimproved shoulder, and concrete sidewalk. Work includes all labor, materials, equipment, and services necessary to complete the facility as shown in the ITB construction plans. Major components of the work include site preparation with MOT; erosion and sediment control; well permitting and drilling; well head piping with air…

Time remaining

Closes Sep 23, 2026

09Days
:
09Hours
:
58Min
:
43Sec

Related Opportunities

Bid details are gathered and summarized automatically. Please verify details at the original source.

Ref No.

BS-A9F4D9