The City of Buford wants a contractor to install an 80-foot-wide by 14-foot-tall circular concrete secondary clarifier at its Southside Water Pollution Control Plant. Work also includes grading, electrical upgrades, metal stairs and platform with railings, process piping and valves, and erosion and sediment controls. An optional pre-bid meeting is scheduled for September 9, 2026, at 10:00 a.m. ET at Buford City Hall.

About this opportunity

The Work includes installation of an 80-foot wide by 14-foot-tall circular concrete secondary clarifier at the Southside Water Pollution Control Plant. Associated work includes site grading electrical upgrades, elevated metal stairs & platform with railings, process piping and valving, and erosion and sediment control measures. The Contractor shall furnish all labor and materials necessary to complete the authorized Work. Pre-bid meeting (attendance optional): Sep 09, 2026 @ 10:00 AM ET at Buford City Hall, 2300 Buford Hwy, Buford. Point of contact: Clyde Black ([email protected]). Event PE-66325-NONST-2027-000000016 on the Georgia Procurement Registry (GPR), Georgia's statewide…

Time remaining

Closes Sep 29, 2026

15Days
:
11Hours
:
42Min
:
33Sec

Related Opportunities

Bid details are gathered and summarized automatically. Please verify details at the original source.

Ref No.

BS-BADE7C