Opportunity timeline

PostedAug 18, 2026
DeadlineSep 16, 2026

In plain English

The Air Force wants a contractor to replace the reception counter and cabinets at the Buckley SFB Outdoor Recreation facility, Building 1022. The work includes demolition, a new ADA-compliant L-shaped counter, three-tier storage, two ski desks, electrical conduit, and plumbing hookups while operations continue. A site visit is scheduled for September 1, 2026, at 10:00 a.m. MST; base-access information is due by August 26, 2026, at 10:00 a.m. MST.

About this opportunity

The Buckley SFB Outdoor Recreation (ODR) facility (Bldg. 1022) is upgrading its reception area to improve service delivery and organizational workflow. This project involves the complete demolition of the existing front desk and the single-phase installation of a new, ADA-compliant L-shaped front counter paired with a structured, three-tiered back-wall storage system. The upgraded reception counter features a durable, seamless 100% acrylic surface with two 42-inch high caps and a 30-inch high accessible section, while the rear storage unit integrates lockable lower cabinets, a middle whiteboard layer, and open overhead shelving. Additionally, the contractor will install two ski desks, route…

Time remaining

Closes Sep 16, 2026

02Days
:
15Hours
:
40Min
:
55Sec

Related Opportunities

Bid details are gathered and summarized automatically. Please verify details at the original source.

Ref No.

BS-03E50D