Opportunity timeline
In plain English
Napa County wants a qualified architectural and engineering design team with animal-shelter experience to study and design a phased expansion of the existing shelter at 942 Hartle Court in Napa. The planning feasibility study will come first, followed by expansion design and construction planning. The county will use a qualifications-based selection process and negotiate with the highest-ranked firm.
About this opportunity
Napa County Public Works is soliciting proposals from qualified design teams interested in providing animal shelter-specialized architectural and engineering services for the purposes of expanding the existing facility at 942 Hartle Court, Napa, CA 94559. The shelter expansion will be completed in Phases: the planning feasibility study will be completed ahead of the shelter expansion design and construction. Napa County will follow a Qualifications Based Selection process as required by California General Statutes. A team of Napa County staff members will select the most qualified firm to negotiate a contract for services. This Request for Qualifications (RFQ) provides complete information…
Time remaining
Closes Sep 15, 2026
Related Opportunities

BULK OXYGEN (Base+4 Option)

USNS Alan Shepard - Chill Water Valve

Seat ASM - Driver's, Recaro ERGO METRO AM384

Door ASM - Access, Defroster

Filter - Driver's Heater/defroster, Fresh Air (BUSES 5600-5850 Only)
Bid details are gathered and summarized automatically. Please verify details at the original source.
Ref No.
BS-FD384D


