Opportunity timeline
In plain English
The Northeast Ohio Regional Sewer District wants to replace the deteriorating culvert under Sheldon Road with a 60-foot single-span prestressed concrete box beam bridge. The work also raises about 1,060 feet of Sheldon Road in Brook Park and Middleburg Heights, adds shoulders and sidewalks, and is intended to prevent flooding during storms up to the 100-year event.
About this opportunity
The Sheldon Road Profile Raising Bridge Replacement Project (Project) is located along Sheldon Road, on the community border of Brook Park and Middleburg Heights. The project is located within the Abram Creek watershed, a tributary to the Rocky River. Local flooding occurs as early as the 2-year storm event along a portion of Sheldon Road, between Eastland Road and Engle Road, leading to impassable flooding of Sheldon Road. A contributing factor to the flooding is the existing cast-in-place reinforced concrete rigid frame (box) structure beneath Sheldon Road, which is in a state of deterioration. The project involves the construction of a 60' single span prestressed concrete box beam bridge…
Time remaining
Closes Sep 23, 2026
Related Opportunities

Concrete Walkway and Basketball Hoop Install

8/31/2026 IRJCF construction class

6009-DRWP-2026-TELEDYNE Front Panel Board %81265

6009/DOW/OPS-OP-AR62 Honeywell Microswitch

306/JB/Moritz-Razor Wire Repair
Bid details are gathered and summarized automatically. Please verify details at the original source.
Ref No.
BS-3B705E


