Opportunity timeline
In plain English
The City of Seattle wants to convert the Lower Woodland #4 and Fairmount Playground clay/silt infields to synthetic turf. Work includes excavation, stormwater and drainage improvements, aggregate installation, minor irrigation changes, and site restoration; Fairmount also needs a stormwater treatment vault, while Lower Woodland #4 includes a side-sewer connection. The engineer’s estimate is $1,198,227, and both sites are in Seattle, Washington.
About this opportunity
Project Description: Both playfield sites are existing unimproved clay/silt infield soil infields, to be converted to synthetic turf surfacing with a supplemental pad underlayment. The work includes excavation, stormwater utilities, subsurface drainage, import bulk aggregates, minor irrigation systems reconfiguration, and site restoration. The Fairmount site includes a stormwater treatment vault. Lower Woodland 4 includes a side-sewer connection. Engineer's Estimate: $1,198,227.00 Project Location: Lower Woodland #4: 1000 N 50th St Seattle, WA 98103 and Fairmount Playground Infield Conversion: 5400 Fauntleroy Way SW Seattle, WA 98103 Posted by City of Seattle on OpenGov Procurement. Sourced…
Time remaining
Closes Sep 16, 2026
Related Opportunities

Ring Gear Assembly

Wastewater Comprehensive Plan

12-GANG Load Center

8010 Fire System Booster Pump Units

Shore Power Cable
Bid details are gathered and summarized automatically. Please verify details at the original source.
Ref No.
BS-93D455


