Opportunity timeline

PostedAug 19, 2026
DeadlineSep 16, 2026

In plain English

The City of Seattle wants to convert the Lower Woodland #4 and Fairmount Playground clay/silt infields to synthetic turf. Work includes excavation, stormwater and drainage improvements, aggregate installation, minor irrigation changes, and site restoration; Fairmount also needs a stormwater treatment vault, while Lower Woodland #4 includes a side-sewer connection. The engineer’s estimate is $1,198,227, and both sites are in Seattle, Washington.

About this opportunity

Project Description: Both playfield sites are existing unimproved clay/silt infield soil infields, to be converted to synthetic turf surfacing with a supplemental pad underlayment. The work includes excavation, stormwater utilities, subsurface drainage, import bulk aggregates, minor irrigation systems reconfiguration, and site restoration. The Fairmount site includes a stormwater treatment vault. Lower Woodland 4 includes a side-sewer connection. Engineer's Estimate: $1,198,227.00 Project Location: Lower Woodland #4: 1000 N 50th St Seattle, WA 98103 and Fairmount Playground Infield Conversion: 5400 Fauntleroy Way SW Seattle, WA 98103 Posted by City of Seattle on OpenGov Procurement. Sourced…

Time remaining

Closes Sep 16, 2026

02Days
:
16Hours
:
49Min
:
23Sec

Related Opportunities

Bid details are gathered and summarized automatically. Please verify details at the original source.

Ref No.

BS-93D455