Opportunity timeline
In plain English
Lincoln County wants new concrete wing walls built at two existing box culverts in Georgia: one on Metasville Road at Soap Creek and one on Iveytown Road near Clarks Hill Lake. Both are stream crossings. An optional pre-bid meeting is scheduled for September 10, 2026, at 2:00 p.m. ET in Lincolnton.
About this opportunity
Project includes the construction of new concrete wing walls at two existing box culvert locations. One location is along Metasville Road at the Soap Creek stream crossing. The other culvert is located near the backwaters of Clarks Hill Lake along Iveytown Road. Both culvert locations are considered stream crossings. Pre-bid meeting (attendance optional): Sep 10, 2026 @ 02:00 PM ET at Community Development Office, 107 Perryman Avenue, Lincolnton. Point of contact: Roby Seymour ([email protected]). Event PE-69000-NONST-2027-000000013 on the Georgia Procurement Registry (GPR), Georgia's statewide bid posting site. Full documents and how to respond are on the posting — viewing is…
Time remaining
Closes Sep 29, 2026
Related Opportunities

Refrigeration Service for LDC at Fort Stewart, GA

Facility Assessment

Facility Condition Assessment

Fire Alarm Maintenance and Inspection

Bid No. 27003-2001, Union Park Pavilion Phase II
Bid details are gathered and summarized automatically. Please verify details at the original source.
Ref No.
BS-52A12D

