Opportunity timeline
In plain English
The Navy wants a contractor to repair, test, inspect, and return an NRP cabinet assembly C1, part number 1025396G-1, NSN 1680-016102285. The required repair turnaround time is 180 days after the asset is received, with induction ending 365 days after contract award. Work must follow current repair drawings and include approved quality-control procedures; the notice does not state a quantity or proposal due date.
About this opportunity
Repair Turnaround Time (RTAT) definition: The contractual delivery requirement is measured from asset Return to the date of asset acceptance under the terms of the contract. For purposes of this section, Return is defined as physical receipt of the F-condition asset at the contractors facility as reflected in the Action Date entry in the Commercial Asset Visibility (CAV) system. In accordance with the CAV Statement of Work, the contractor is required to accurately report all transactions by the end of the fifth regular business day after receipt and the Action Date entered in CAV must be dated to reflect the actual date of physical receipt. The Contractor must obtain final inspection and…
Time remaining
Closes Oct 19, 2026
Related Opportunities

Resistor, VA, NONWI

SPRRA1-26-R-A013

MH-65 Backing Brake Plate

Production of C-130 Peculiar Support Equipment

Elbow, Tube
Bid details are gathered and summarized automatically. Please verify details at the original source.
Ref No.
BS-DFA4C9

