Opportunity timeline

PostedAug 17, 2026
DeadlineSep 24, 2026

In plain English

The City of Grovetown wants a contractor to build a sidewalk along East Robinson Avenue. Work includes stormwater infrastructure, utility relocation, and erosion control, with 180 consecutive calendar days allowed for construction. Full bid documents and response instructions are available through the Georgia Procurement Registry posting PE-66209-NONST-2027-000000006.

About this opportunity

The work to be done consists of furnishing all materials, equipment and labor for the construction of a sidewalk along East Robinson Avenue. The scope of the project includes a new sidewalk, new stormwater infrastructure, relocation of existing utilities and all applicable erosion control measures. Time allotted for construction is 180 consecutive calendar days. Point of contact: Amanda Case ([email protected]). Event PE-66209-NONST-2027-000000006 on the Georgia Procurement Registry (GPR), Georgia's statewide bid posting site. Full documents and how to respond are on the posting — viewing is public.

Time remaining

Closes Sep 24, 2026

10Days
:
11Hours
:
42Min
:
13Sec

Related Opportunities

Bid details are gathered and summarized automatically. Please verify details at the original source.

Ref No.

BS-D3E9C8