Opportunity timeline

PostedAug 18, 2026
DeadlineSep 15, 2026

In plain English

The Guadalupe-Blanco River Authority seeks installation of about 111 linear feet of open-cut, 48-inch flanged split steel casing for the Coleto Creek Pipeline relocation on FM 237. The work also includes welding the casing to the existing carbon steel encasement, installing about 59 linear feet of concrete trench cap, erosion controls, site restoration, and seeding. Plans, addenda, and bidding are managed through CivCast.

About this opportunity

Installation of approximately 111 LF of open-cut, 48’’ flanged split steel casing. Split steel casing to be welded to the existing carbon steel encasement. Installation of approximately 59 LF of concrete trench cap. Installation of erosion controls, site restoration and seeding required. Sourced from CivCast, where plans, addenda, and bidding are managed.

Time remaining

Closes Sep 15, 2026

01Days
:
14Hours
:
42Min
:
55Sec

Related Opportunities

Bid details are gathered and summarized automatically. Please verify details at the original source.

Ref No.

BS-7AFCBB