Opportunity timeline

PostedAug 14, 2026
DeadlineSep 29, 2026

In plain English

The City of Santa Fe wants upgrades to Dissolved Air Flotation Thickener Units 1 and 2 at the PRWRF. Work includes modifying the air-water saturation system, installing air-entraining pumps and a structural stand for the break tank, integrating SCADA and controls, and completing related electrical work, demolition, abandonment, and replacements. Plans, addenda, and questions are managed through OpenGov Procurement.

About this opportunity

The Work to be performed as per the DAF Unit 1 2 Upgrade Project Manual includes, but is not limited to, constructing the Work described below and all appurtenances related to the Work. The Work shall be as follows: 1. Modification of the air water saturation system for the dissolved air floatation process at the PRWRF. Scope includes new air-entraining pumps, necessary electrical connections, structural stand for break tank which supplies non-potable water to the air entraining pumps.

2. SCADA and control integration associated with all newly installed equipment 3. Associated demolition, abandonment, and replacement of all required disciplines/divisions. Posted by City of Santa Fe, NM on…

Time remaining

Closes Sep 29, 2026

15Days
:
13Hours
:
04Min
:
15Sec

Related Opportunities

Bid details are gathered and summarized automatically. Please verify details at the original source.

Ref No.

BS-FFE44E