Opportunity timeline
In plain English
The City of Atlanta wants to build a paved shared-use path connecting the Southside Beltline Trail to the Southtowne Trail at South Bend Park. The work will be completed in two phases, with the first ending at Pryor Road and Meldon Avenue and the second continuing to South Bend Park. Full documents and response instructions are available through the City of Atlanta Oracle procurement portal.
About this opportunity
This project will construct a paved shared use path connecting the Southside Beltline Trail to the Southtowne Trail at South Bend Park. This paved shared use path will be delivered in two phases: phase one will extend from the Southside Trail to Pryor Road at Meldon Avenue, while phase two will extend from this point to the Southtowne Trail at South Bend Park. Point of contact: Bonnie Davis ([email protected]). RFP 1260172 from City of Atlanta. 1 attachment(s). Full documents and how to respond are on the City of Atlanta Oracle procurement portal (viewing is public).
Time remaining
Closes Sep 14, 2026
Related Opportunities

Refrigeration Service for LDC at Fort Stewart, GA

Facility Assessment

Facility Condition Assessment

Fire Alarm Maintenance and Inspection

Bid No. 27003-2001, Union Park Pavilion Phase II
Bid details are gathered and summarized automatically. Please verify details at the original source.
Ref No.
BS-A2530E


