Opportunity timeline

PostedAug 14, 2026
DeadlineOct 13, 2026

In plain English

The Navy wants a contractor to repair, upgrade, test, inspect, and return Multifunctional Controllers (P/N 184891-001; NSN 7RH 1680 015855325 P8) to ready-for-issue condition. The contractor must provide the facility, labor, parts, materials, tooling, and testing equipment. Required repair turnaround is 179 days after receiving each asset, with a 365-day warranty after delivery.

About this opportunity

This solicitation is for the repair of the items identified herein. These items are covered against Basic Ordering Agreement (BOA) N00383-24-G-B601: Repair Turnaround Time (RTAT) definition: The contractual delivery requirement is measured from asset Return to the date of asset acceptance under the terms of the contract. For purposes of this section, Return is defined as physical receipt of the F-condition asset at the contractor's facility as reflected in the Action Date entry in the Commercial Asset Visibility (CAV) system. In accordance with the CAV Statement of Work, the contractor is required to accurately report all transactions by the end of the fifth regular business day after…

Time remaining

Closes Oct 13, 2026

29Days
:
12Hours
:
41Min
:
25Sec

Related Opportunities

Bid details are gathered and summarized automatically. Please verify details at the original source.

Ref No.

BS-22D994