Opportunity timeline
In plain English
The City of Raleigh wants repairs or replacements for several greenway pedestrian structures. The base bid replaces timber decking on Structures 102 and 103 with fiber-reinforced polymer decking; three alternate options cover Structures 6, 7, and 17 using fiberglass, timber glu-lams, timber decking, steel framing, or FRP decking. Full documents and response instructions are on North Carolina’s electronic Vendor Portal, where vendors need a free registration to respond.
About this opportunity
The Project consists generally of the following major items: Base Bid - Structures #102 and #103 consists of replacing the existing timber decking with Fiber-Reinforced Polymer (FRP) decking. Alternate 1 - Structures #6 and #7 consist of replacing the existing timber structures with fiberglass structures. Alternate 2 - Structure #17 consists of replacing the existing timber structure with Timber Glu-lams and timber decking. Alternate 3 - Structure #17 consists of replacing the existing timber structure with steel framing and Fiber-Reinforced Polymer (FRP) decking. Note from the agency: Contact: Mark Heinicke, PLA / [email protected] / Agency point of contact: Nikolai Merza.…
Time remaining
Closes Sep 29, 2026
Related Opportunities

ARS Reflectance Spectrophotometer-Brand Name

Magnaflux Demagnetizer Semi Annual Preventative Maintenance

Mobile Equipment Fueling

Durham Asbestos Abatement Services "Solicitation"

Durham Asbestos Abatement Services "Pre-solicitation"
Bid details are gathered and summarized automatically. Please verify details at the original source.
Ref No.
BS-E3881E


