Opportunity timeline
In plain English
The government wants a contractor to design and build the Bridge of the Americas Land Port of Entry modernization project in El Paso, Texas. The work includes labor and materials, follows a two-phase design-build process, and includes art and design-construction-operational excellence requirements. Phase 2 has been issued to shortlisted offerors, with award anticipated in January 2027; the contract will have a fixed price.
About this opportunity
Amendment 0003 is hereby posted. =============================================================================================== The planned project is to design and construct a U.S. Land Port of Entry that will reflect the critical importance of this crossing as a gateway to the United States of America. The DB scope of work includes all labor and materials required to provide design and construction services for the BOTA LPOE project pursuant to the Federal Acquisition Regulation (FAR) Two-Phase Design Build Selection Procedures and incorporating Art in Architecture Program, and Design-Construction-Operational Excellence policies and procedures. The resultant contract will be firm fixed…
Time remaining
Closes Oct 15, 2026
Related Opportunities

Seismic Retrofit of the Historic Union Station in Tacoma, WA

Wichita VA Medical Center Campus Wayfinding Signage

Wichita VA Medical Center Campus Wayfinding Signage

589A7-23-306 Renovate Bldg. 5 & 5B for Mental Health FY27 NRM

East Campus Unclassified Modular Facility, Fort George G. MEADE, MD
Bid details are gathered and summarized automatically. Please verify details at the original source.
Ref No.
BS-EBD4D4