Opportunity timeline
In plain English
San Francisco International Airport is seeking a contractor for improvements to the timber trestles at Runways 19L, 28L, and 28R. This is a locally funded design-bid-build project requiring a California contractor license and participation by local business enterprises; the provided notice does not include the cost, duration, or bid deadline.
About this opportunity
1.01 Project Summary Contract Number: Project ID Project Title: Project Title Delivery Type: Design-Bid-Build Funding: Local Funding Source
1.02 Project Description: Contract Description
1.03 Contract Duration: The Contract Time is Total Contract Time / Final Completion total consecutive calendar days after the effective date indicated in the Notice to Proceed. See Document 00 54 39 (Contract Time and Liquidated Damages) for additional details.
1.04 Estimate: The estimated cost of construction is Estimated Construction Range .
1.05 License Requirements: California Class “ Contractor License Requirements ” license is required at the time of Bid.
Time remaining
Closes Sep 18, 2026
Related Opportunities

BULK OXYGEN (Base+4 Option)

USNS Alan Shepard - Chill Water Valve

Seat ASM - Driver's, Recaro ERGO METRO AM384

Door ASM - Access, Defroster

Filter - Driver's Heater/defroster, Fresh Air (BUSES 5600-5850 Only)
Bid details are gathered and summarized automatically. Please verify details at the original source.
Ref No.
BS-4B7C56


