Sidewalk Construction on SW 6th Place from SW 70th Terrace to SW 67th Terrace

Opportunity timeline

In plain English
Alachua County wants to build a six-foot-wide sidewalk on the north side of SW 6th Place in Gainesville, between SW 70th Terrace and SW 67th Terrace. The work includes rebuilding eight driveways, adding ADA ramps with detectable warnings, and extending curb and gutter. Construction must follow FDOT and Alachua County specifications.
This project consists of constructing a six (6) foot wide sidewalk on the north side of SW 6th Place between SW 70th Terrace and SW 67th Terrace in Gainesville, FL. This project will include the reconstruction of eight (8) driveways within the proposed sidewalk project area that have specific specifications as shown on the provided Bid Set Plans. The proposed sidewalk project will include tie-ins to existing intersections and sidewalks that will require the construction of ADA ramps with detectable warnings in accordance with FDOT requirements. This will also include extending curb and gutter systems from SW 6th Place to SW 67th Terrace. All designs and construction will be in accordance…
Time remaining
Closes Sep 16, 2026





Bid details are gathered and summarized automatically. Please verify details at the original source.
Ref No.
BS-BDF02A