Opportunity timeline

PostedAug 12, 2026
DeadlineSep 30, 2026

In plain English

The City of Clearwater wants a contractor to rehabilitate Lift Stations 13, 51, and 58. Work includes structural repairs, generators, electrical and instrumentation upgrades, piping, flow control and bypass pumping, site restoration, testing, and related work. The contract period is 420 consecutive calendar days.

About this opportunity

Lift Station (LS) 13 includes furnishing and installing wet well and valve vault top slab and portions of side walls, access hatches with safety grate, magnetic flow meter and precast vault, natural gas generator with platform and concrete foundation, handrail, fencing, temporary and permanent electrical work, instrumentation and integration, site work, gravity sewer relocation, natural gas piping and coordination with Clearwater Gas (CGS Energy), maintaining wastewater flow, surface restoration, tree protection and trimming, grading, start-up and testing, and all appurtenant work needed for complete and operational systems, as indicated on the Drawings and as specified. Lift Station (LS)…

Time remaining

Closes Sep 30, 2026

16Days
:
15Hours
:
42Min
:
34Sec

Related Opportunities

Bid details are gathered and summarized automatically. Please verify details at the original source.

Ref No.

BS-637C40