Opportunity timeline
In plain English
The City of Tustin is seeking bids to improve Main Street Well 3 and Newport Well 3. Work includes inspecting and rehabilitating wells, pumps, and motors; possible equipment replacement; electrical, controls, flow-meter, valve, and SCADA work; testing, disinfection, and site restoration. The project is CIP No. 60177 and is scheduled for 2026/2027.
About this opportunity
NOTICE IS HEREBY GIVEN that the CITY OF TUSTIN, hereinafter referred to as City or AGENCY invites sealed bids for the above stated project and will receive sealed bids for the construction, materials, supplies, equipment and/or services set forth herein, subject to all conditions outlined in the Bid Package. Scope of Work: The Work encompassed by the Project is more specifically defined in the Contract Documents, but in general consists of, but is not limited to the following Work: Main Street Well #3: Perform pre-removal testing and document existing pump and motor operating conditions. Remove, transport, inspect, test, and evaluate the existing pump and motor; submit condition-assessment…
Time remaining
Closes Sep 15, 2026
Related Opportunities

BULK OXYGEN (Base+4 Option)

USNS Alan Shepard - Chill Water Valve

Seat ASM - Driver's, Recaro ERGO METRO AM384

Door ASM - Access, Defroster

Filter - Driver's Heater/defroster, Fresh Air (BUSES 5600-5850 Only)
Bid details are gathered and summarized automatically. Please verify details at the original source.
Ref No.
BS-C5C144


