Opportunity timeline

PostedAug 11, 2026
DeadlineOct 5, 2026

In plain English

The U.S. Air Force wants ongoing repair, rebuilding, and remanufacturing of PIGA Float Assemblies used in Minuteman III missile guidance systems, at about 96 units per year. The planned contract is a five-year IDIQ, with ordering from November 1, 2026, through October 31, 2031, using both cost-plus-fixed-fee and firm-fixed-price work. This is intended as a sole-source procurement from Honeywell Aerospace, and proposals must be submitted through PIEE; the notice does not provide a proposal deadline.

About this opportunity

Login at https://piee.eb.mil and search for 'FA821426RB002' to obtain more details.* Documents related to this procurment are only available through PIEE. 1. Executive Summary: Background & Objective The U.S. Air Force has a critical requirement to support the Minuteman III (MMIII) Intercontinental Ballistic Missile (ICBM) by maintaining the operational readiness of the Missile Guidance Set (MGS) to meet warfighter requirements. Specifically, this effort supports the repair line for the Pendulous Integrated Gyroscopic Accelerometer (PIGA) Float Assembly. The PIGA Float is a critical and precise sub-assembly that serves as the heart of the PIGA instrument, enabling it to measure missile…

Time remaining

Closes Oct 5, 2026

21Days
:
12Hours
:
44Min
:
34Sec

Related Opportunities

Bid details are gathered and summarized automatically. Please verify details at the original source.

Ref No.

BS-4B1240