Fort Eustis Dredge Material Management Area Construction in Newport News, Virginia

Opportunity timeline

In plain English
The Army Corps of Engineers is looking for contractors to regrade and raise berms, relocate spill boxes, and regrade an access ramp at the Fort Eustis Dredge Material Management Area in Newport News, Virginia. This project, estimated to cost between $5 million and $10 million, is a "sources sought" announcement to gauge interest and capabilities, not a request for proposals. Interested businesses should submit a brief capabilities statement by email, including their business size, bonding capacity, and examples of similar past projects.
PROJECT DESCRIPTION: The Norfolk District, Corps of Engineers is contemplating a firm-fixed-price contract for the Design-Bid-Build construction of maintenance requirements at the Fort Eustis Dredge Material Management Area, located at JBLE – Eustis with provisions to include: Regrading/raising the disposal site berms to an elevation of 36 ft. The berms are currently at elevation 34 ft and have settled in a few places to below 34 ft. The work will also include the relocation of two existing spill boxes 50 – 60 feet into the disposal site. The existing access dirt and stone access ramp will need to be regraded, as well, to meet the new top-of-berm elevation. Magnitude of Construction cost is…
Time remaining
Closes Dec 1, 2026





Bid details are gathered and summarized automatically. Please verify details at the original source.
Ref No.
BS-43FF24