Bid guide
How to bid on the Natomas PP5 Pumping Plant Construction for USACE
What the agency is buying and why it matters
The U.S. Army Corps of Engineers (USACE) Sacramento District is seeking a contractor to demolish the current Pumping Plant 5 (PP5) and build a new pumping plant facility in Sacramento, California. This project is part of the American River Common Features, Natomas Basin Project.
The new pumping plant will be located approximately 300 feet up the West Drainage Canal from the existing site. Its purpose is to discharge stormwater from the canal into the Sacramento River. This construction is necessary to allow for levee improvements, including a seepage berm, adjacent levee work, and raising discharge pipes above the 200-year water surface elevation.
Key dates and what happens at the deadline
This solicitation was published on July 31, 2026. The deadline for submitting your response is September 01, 2026, at 12:00 PM Eastern Time. All proposals must be submitted by this time.
It is crucial to submit your bid before the deadline. Late submissions are generally not accepted and will not be considered for award.
Who this opportunity suits
This opportunity is suitable for construction firms with experience in demolishing existing structures and building new pumping plant facilities. Contractors familiar with civil engineering projects involving water management, levee improvements, and stormwater discharge systems will find this relevant.
The project falls under the construction category, specifically involving infrastructure development related to flood control and water resources.
How to respond
To access the full bidding instructions and requirements, you need to view the original source document on the government portal. Click the “View original source” link. If the first click takes you to the portal’s homepage, click the link again to go directly to the bid.
You may need to create a free account on the portal to view all the documents. However, for many bids, an account is not required to access the information.
Practical tips for a competitive response
Carefully read the entire solicitation document, including all attachments, clauses, and specifications. Pay close attention to the scope of work for both demolition and new construction, as well as any specific technical requirements for the pumping plant.
Ensure your proposal clearly demonstrates your firm's experience with similar projects, particularly those involving water infrastructure, levee systems, and environmental considerations. Highlight your team's qualifications and any relevant certifications. Double-check that all required forms and documentation are completed accurately and submitted by the deadline.
See the live bid — deadline, agency details, and how to respond
Dates and requirements can change via addenda; always verify on the bid page and at the original source before responding.
View this bid on BiddingSimpleThis guide was prepared by BiddingSimple from the solicitation’s public posting. It is not official guidance from DEPT of Defense; the original posting controls.