Bid guide

How to bid on Turkey Creek WPCP LAS Expansion for the City of Bremen

City of Bremen Bremen, GACloses August 13, 2026

What the City of Bremen is buying

The City of Bremen is seeking a contractor to expand the Land Application System at the Turkey Creek Wastewater Pollution Control Plant. This project involves installing approximately 1,560 feet of HDPE forcemain and 120 feet of ductile iron forcemain. It also includes the installation of three pressure-reducing valves.

The work further requires the creation of two new land application spray fields. These fields will include 68 irrigation sprayheads and associated HDPE yard piping. Additionally, the contractor will install monitoring wells to meet Georgia Environmental Protection Division (EPD) standards.

Key dates for this opportunity

This solicitation was published on July 09, 2026. The deadline for submitting your bid is August 13, 2026, at 3:00 PM ET. All responses must be submitted by this time to be considered.

Who this opportunity suits

This opportunity is suitable for construction firms with experience in wastewater infrastructure, particularly those familiar with land application systems, forcemain installation, and EPD compliance for monitoring wells. Contractors with expertise in installing HDPE and ductile iron piping, pressure-reducing valves, and irrigation spray field systems will find this project aligns with their capabilities. This is a construction category bid.

How to respond to this solicitation

To access the full bid documents and response instructions, you need to go to the Georgia Procurement Registry (GPR). The event number is PE-60878-NONST-2026-000000002. Viewing the posting and its document list is public and does not require an account.

Some events on the Georgia Procurement Registry route documents and responses to an external "Event Link," such as Team Georgia Marketplace. Otherwise, you should submit your response as directed on the posting itself, ensuring it is submitted before the stated deadline. For questions, you can contact Melissa Skidmore at [email protected].

Tips for a competitive response

When preparing your bid, carefully review all specifications related to the HDPE and ductile iron forcemain installations, as well as the requirements for the pressure-reducing valves. Pay close attention to the detailed plans for the two land application spray fields, including the number and type of sprayheads and yard piping.

Ensure your proposal clearly addresses the installation of monitoring wells and demonstrates your understanding of Georgia EPD standards. Provide a comprehensive breakdown of your proposed approach, materials, and timeline. Double-check that all required forms and documentation are completed accurately and submitted by the August 13, 2026 deadline.

See the live bid — deadline, agency details, and how to respond

Dates and requirements can change via addenda; always verify on the bid page and at the original source before responding.

View this bid on BiddingSimple

This guide was prepared by BiddingSimple from the solicitation’s public posting. It is not official guidance from City of Bremen; the original posting controls.