Bid guide

How to bid on the Town of Norton Well 4 Replacement Project

Town of Norton Norton, MACloses August 18, 2026

What the Town of Norton is buying

The Town of Norton is seeking a contractor to replace the drinking-water pump system for Well 4. The goal is to install a new, fully operational well pump system.

The work involves furnishing and installing a pitless adaptor, a submersible well pump, and all related piping, a well meter, and electrical work. It also includes coordination with the Town's instrumentation and control vendor, site work, environmental protection, and installing chain-link fencing. This is an opportunity for construction firms specializing in water infrastructure.

Key dates and what happens at the deadline

This solicitation was published on August 04, 2026. The deadline for submissions is August 18, 2026, at 1:00 PM ET. All responses must be submitted by this time.

It is important to submit your bid well before the deadline to avoid any last-minute technical issues. Late submissions may not be considered.

Who this opportunity suits

This opportunity is suitable for construction firms with experience in water utility infrastructure, specifically the installation and replacement of well pump systems. Vendors should be capable of handling mechanical, electrical, and site work components.

The project falls under the construction category and requires expertise in drinking water supply systems. Firms familiar with municipal projects in Massachusetts may find this particularly relevant.

How to respond to this solicitation

Full bid documents and instructions are available on COMMBUYS, the Commonwealth of Massachusetts procurement portal. You can view the original source directly to access the bid details.

Documents can be downloaded straight from the bid page without needing an account. To submit an electronic quote, you will need to register a free COMMBUYS vendor account. Otherwise, follow the specific submission directions provided within the bid documents. For questions, you can contact Frank Fournier at [email protected].

Practical tips for a competitive response

When preparing your response, ensure you clearly address all components of the scope of work, including the pitless adaptor, submersible pump, piping, meter, electrical, and instrumentation coordination. Detail your experience with similar projects.

Pay close attention to the site work and environmental protection requirements. Provide a clear timeline and demonstrate your capacity to complete the project within the Town's expectations. Double-check all submission requirements on COMMBUYS to ensure your bid is compliant.

See the live bid — deadline, agency details, and how to respond

Dates and requirements can change via addenda; always verify on the bid page and at the original source before responding.

View this bid on BiddingSimple

This guide was prepared by BiddingSimple from the solicitation’s public posting. It is not official guidance from Town of Norton; the original posting controls.