Bid guide
How to bid on Furniture Install Sit Stands (P2025-1016601) for HHS
What the agency is buying
The Department of Health and Human Services (HHS) is seeking a contractor to convert existing Allsteel cubicles into electric sit-stand workstations. This is a turnkey solution for Building 106, floors 3-7, in Chamblee, Georgia. The work includes installing height controls, cable managers, surge protector extension cords, and desktop power monuments. New worksurfaces are only required if existing ones cannot be reused. The contractor must ensure operational continuity during the installation process.
Key dates and deadlines
This solicitation was published on August 06, 2026. The deadline for submitting your response is August 14, 2026, at 3:00 PM ET. All proposals must be received by this time to be considered.
Who this opportunity suits
This opportunity is suitable for businesses specializing in office furniture installation, particularly those with experience in converting existing workstations to sit-stand models. Firms familiar with Allsteel products and providing comprehensive FF&E (Furniture, Fixtures, and Equipment) solutions would be a good fit. This falls under the supplies category for government contracting.
How to respond
To access the solicitation documents, click “View original source” to open the opportunity on the portal. If the first click takes you to the portal's homepage, click the link again to go directly to the bid. You may need to create a free account on the portal to view all associated documents, though this is not always required for every bid.
Tips for a competitive response
When preparing your response, clearly detail your experience with similar workstation conversion projects, especially those involving Allsteel furniture. Emphasize your plan for maintaining operational continuity throughout the installation, as this is a stated requirement. Provide a clear scope of work that addresses all specified accessories, including height adjustment controllers, cable managers, surge protectors, and desktop power monuments. If you anticipate reusing existing worksurfaces, explain your assessment process. If new worksurfaces are needed, ensure they match the existing setup as required.
See the live bid — deadline, agency details, and how to respond
Dates and requirements can change via addenda; always verify on the bid page and at the original source before responding.
View this bid on BiddingSimpleThis guide was prepared by BiddingSimple from the solicitation’s public posting. It is not official guidance from Health and Human Services, Department of; the original posting controls.
