Bid guide

How to bid on Nolin River Lake Tailwater Restroom Construction for the Army

DEPT of the ArmyCloses August 11, 2026

What the Army is buying

The Department of the Army needs a contractor to build a flush restroom facility at the Tailwater Recreation Area of Nolin River Lake, Kentucky. This project involves furnishing all labor, materials, tools, and equipment necessary for the construction.

The contractor will be responsible for all planning, programming, measurements, estimates, administration, supervision, communications, and inspection to ensure the work meets contract requirements and all applicable laws and regulations. The estimated value of this construction project is between $100,000 and $250,000. Prevailing construction wage rates apply.

Key dates and deadlines

This solicitation was published on July 22, 2026. All responses are due by August 11, 2026, at 11:00 AM ET. It is important to submit your bid before this exact deadline.

Who this opportunity suits

This opportunity is a 100% small business set-aside. It is suitable for construction firms specializing in commercial and institutional building construction, specifically under NAICS code 236220. The size standard for this NAICS code is $45,000,000.00.

Bidders should be prepared to provide either a payment bond or an irrevocable letter of credit, as only one of these is required in lieu of both performance and payment bonds.

How to respond

To access the solicitation documents, click “View original source” to open the opportunity on the portal. If the first click takes you to the portal’s homepage, click the link again to go directly to the bid. You may need a free account to view all documents, though this is not always necessary.

Tips for preparing a competitive response

Carefully review all specifications and requirements to ensure your proposal addresses every aspect of the restroom facility construction. Pay close attention to the prevailing construction wage rates and factor them into your quote.

Since this is a construction project, clearly detail your experience with similar projects, your team's qualifications, and your proposed approach to project management, quality control, and safety. Ensure your financial protections, whether a payment bond or an irrevocable letter of credit, are in order and meet the specified requirements.

See the live bid — deadline, agency details, and how to respond

Dates and requirements can change via addenda; always verify on the bid page and at the original source before responding.

View this bid on BiddingSimple

This guide was prepared by BiddingSimple from the solicitation’s public posting. It is not official guidance from DEPT of the Army; the original posting controls.