Bid guide
How to bid on Niantic River Boardwalk Deck Replacement for the Town
What the Town is buying and why it matters
The Town is looking for a contractor to replace 558 linear feet of 10-foot-wide decking on the Niantic River Boardwalk. This boardwalk is located between the Niantic River and Route 156. The project includes all necessary equipment, tools, materials, hardware, traffic control, and labor.
This is a construction opportunity for firms specializing in boardwalk or similar outdoor decking projects. It's a chance to work on public infrastructure in Connecticut.
Key dates and what happens at the deadline
This Invitation for Bid (IFB) was published on July 21, 2026. The deadline for submitting your bid is August 20, 2026, at 2:00 PM ET. All responses must be submitted by this time.
A mandatory pre-bid site meeting is scheduled for August 6, 2026, at 10:00 AM at Cini Park (22 Main St. / Rt. 156). The Town may disqualify bids from contractors who do not attend this meeting.
Who this opportunity suits
This opportunity is suitable for construction firms with experience in boardwalk construction, deck replacement, or similar outdoor public works projects. Contractors should be prepared to handle all aspects of the project, including materials, labor, and traffic control.
The project is categorized under construction, specifically for infrastructure repair and replacement.
How to respond to this solicitation
To access the full bid documents and respond, you need to go to CTsource, Connecticut's statewide procurement portal. You can view the bid details without an account.
To download documents or submit your response, you will need a free CTsource account. Make sure to complete your submission before the August 20, 2026, 2:00 PM ET deadline.
Practical tips for a competitive response
Since a pre-bid site meeting is mandatory, ensure your firm is represented. This meeting is crucial for understanding the project site and asking any clarifying questions directly to the agency, which can inform a more accurate and competitive bid.
Carefully review all specifications for materials and construction methods. Provide a detailed breakdown of costs for equipment, materials, and labor to show a clear understanding of the project scope. Highlight any relevant past experience with similar boardwalk or public infrastructure projects in your proposal.
See the live bid — deadline, agency details, and how to respond
Dates and requirements can change via addenda; always verify on the bid page and at the original source before responding.
View this bid on BiddingSimpleThis guide was prepared by BiddingSimple from the solicitation’s public posting. It is not official guidance from Town; the original posting controls.
