Bid guide
How to bid on CS Fiber Optics Infrastructure Rehoming Project-156th WG PR ANG
What the 156th Wing is buying
The 156th Wing of the Department of Defense needs a contractor to relocate existing fiber-optic infrastructure to a new facility at Muniz Air National Guard Base in Carolina, Puerto Rico. This project involves installing, terminating, and testing new primary and redundant single-mode fiber optic cables, along with patch panels and all necessary documentation.
The work must be completed within 60 calendar days from the delivery of the contract. This is a 100% small business set-aside, with an estimated value between $250,000 and $500,000. The NAICS code is 237130, Power and Communication Line and Related Structures Construction, with a small business size standard of $19 million.
Key dates and deadlines
The deadline for submitting quotes is August 17, 2026, at 10:00 AM ET. All offers must be received by this time. A site visit was held on August 3, 2026. Requests for Information (RFIs) were due by August 7, 2026, at 2:00 PM CT, with agency responses tentatively posted around August 12, 2026.
Who this opportunity suits
This opportunity is suitable for small businesses specializing in power and communication line construction, particularly those with experience in fiber optic installation, termination, and testing. Firms must be registered in SAM.gov and meet the $19 million small business size standard for NAICS code 237130. Contractors should be prepared to complete the project within a 60-day timeframe.
How to respond
To access the solicitation and related documents, click “View original source” on the portal. If the first click takes you to the portal’s homepage, click it again to go directly to the bid. You may need a free account to view all documents, though this is not always required.
Ensure your firm is registered in SAM.gov. Carefully review the solicitation, including the Scope of Works (SOW) and any amendments. Prepare your quote in accordance with the Federal Acquisition Regulation (FAR) Part 12 procedures for commercial services, as specified in the solicitation.
Practical tips for a competitive response
Thoroughly read all sections of the solicitation, including any amendments, to understand the full scope of work and requirements. Pay close attention to the technical specifications for fiber optic installation, termination, and testing, as well as the documentation requirements.
Ensure your proposed solution clearly addresses all aspects of the Scope of Works. Detail your experience with similar projects, especially those involving secure government installations. Clearly outline your plan for completing the project within the 60-day period of performance, including your approach to quality control.
Review the attached Wage Determination and understand its implications, particularly regarding FAR clause 52.222-55. Double-check that your SAM.gov registration is active and up-to-date before submitting your quote. Submit your quote well in advance of the August 17, 2026, 10:00 AM ET deadline to avoid any last-minute technical issues.
See the live bid — deadline, agency details, and how to respond
Dates and requirements can change via addenda; always verify on the bid page and at the original source before responding.
View this bid on BiddingSimpleThis guide was prepared by BiddingSimple from the solicitation’s public posting. It is not official guidance from DEPT of Defense; the original posting controls.