How to bid on Maintenance Dredging at Naval Submarine Base Kings Bay for the Dept. of the Army
What the agency is buying
The U.S. Department of the Army is seeking contractors for maintenance dredging of the Kings Bay Entrance Channel. This work covers areas in Camden County, Georgia, and Nassau County, Florida. The project involves excavating material and distributing it to four specific disposal or beach placement areas.
Additional tasks include environmental and water quality monitoring, vibration monitoring, beach fill quality control, beach tilling, and wildlife trawling for sea turtles and sturgeon. There are also options for pre-placement debris removal at Fort Clinch and additional beach tilling. The estimated value of this project is between $20 million and $30 million, with a performance period of 185 days after receiving the notice to proceed.
Key dates and deadlines
The deadline for submitting bids is August 12, 2026, at 1:00 PM Eastern Daylight Time. All proposals must be received by this time. The contractor will have 185 calendar days to complete the work after receiving the Notice to Proceed, and must start work within 60 calendar days of receiving that notice.
Who this opportunity suits
This opportunity is suitable for construction firms specializing in heavy civil engineering, particularly those with experience in dredging operations and environmental management. The NAICS code for this procurement is 237990, Other Heavy Civil Engineering Construction, with a small business size standard of $37 million. This is an unrestricted procurement, meaning businesses of all sizes can compete.
How to respond
To access the solicitation documents and prepare your response, you will need to view the original source on the portal. Click the “View original source” link. If the first click takes you to the portal’s homepage, click it again to go directly to the bid. You may need to create a free account on the portal to view all documents, though this is not always required for every bid.
Tips for a competitive response
When preparing your bid, ensure you thoroughly address all aspects of the project description, including the base work and any optional tasks. Clearly outline your experience with similar dredging projects, environmental monitoring, and wildlife protection protocols, especially concerning sea turtles and sturgeon trawling. Provide a detailed project plan that demonstrates your capacity to complete the work within the 185-day performance period and commence within 60 days of notice to proceed.
Given the project's scope and value, pay close attention to your cost proposal to ensure it is competitive while accurately reflecting the resources and expertise required. Double-check all submission instructions and requirements outlined in the solicitation documentation to avoid any disqualifications.
See the live bid — deadline, agency details, and how to respond
Dates and requirements can change via addenda; always verify on the bid page and at the original source before responding.
View this bid on BiddingSimpleThis guide was prepared by BiddingSimple from the solicitation’s public posting. It is not official guidance from DEPT of the Army; the original posting controls.