Bid guide

How to bid on Multiple Trail Bridges Replacement Project Phase 2 for the Forest Service

Forest Service Lakemont, GACloses September 1, 2026

What the agency is buying

The USDA Forest Service is seeking a small business contractor for the Multiple Trail Bridges Replacement Project Phase 2. This project involves constructing seven new trail bridges, repairing one trail embankment slope, and building a boardwalk platform with a ramp. The work will be performed in the Chattooga River Ranger District of the Chattahoochee-Oconee National Forest in Lakemont, GA.

This is a significant construction opportunity, with an estimated value between $5 million and $10 million. It is set aside specifically for small businesses.

Key dates and deadlines

The solicitation was published on July 22, 2026. All quotations are due by September 01, 2026, at 12:00 PM ET. This is a firm deadline, and late submissions may not be considered.

An optional site visit is scheduled for July 28, 2026, at 7:00 AM. If you plan to attend, you are highly encouraged to RSVP via email to [email protected].

Who this opportunity suits

This opportunity is ideal for small business contractors specializing in construction, particularly those with experience in highway, street, and bridge construction. The applicable North American Industry Classification Standard (NAICS) Code is 237310, with a small business size standard of $45 million.

Firms with a proven track record in bridge construction, embankment repair, and boardwalk installation in natural or forest environments will be well-suited for this project.

How to respond

To access the solicitation details and prepare your response, you will need to view the original source on the government portal. First, click the "View original source" link. If you land on the portal's homepage, click the link again to go directly to the bid.

You may need to create a free account on the portal to view all associated documents, though for some bids, this is not required. This is a Request for Quotation (RFQ), and a separate written solicitation will not be issued beyond this announcement.

Tips for a competitive response

Given the nature of this construction project, ensure your quotation clearly outlines your firm's experience with similar bridge, embankment, and boardwalk construction. Provide specific examples of past projects, including their scope and value.

Attending the optional site visit on July 28, 2026, is highly recommended. This will give you a firsthand understanding of the project site and potential challenges, which can help you formulate a more accurate and competitive bid. Remember to RSVP by email if you plan to attend.

Carefully review all attachments and requirements in the solicitation. Pay close attention to any specific technical specifications, material requirements, and performance standards. A well-organized and thorough response that directly addresses all aspects of the solicitation will be more competitive.

See the live bid — deadline, agency details, and how to respond

Dates and requirements can change via addenda; always verify on the bid page and at the original source before responding.

View this bid on BiddingSimple

This guide was prepared by BiddingSimple from the solicitation’s public posting. It is not official guidance from Forest Service; the original posting controls.