Bid guide
How to bid on Monongahela National Forest FR 81 Bridge Work for the Forest Service
What the Forest Service is buying
The Forest Service needs a contractor to build a new single-span steel girder and timber deck bridge on FR 81 within the Monongahela National Forest. This project involves removing the existing bridge and installing a new one with a full-width timber wearing surface.
The work includes several key tasks: construction survey and staking, erosion and sediment control, clearing and grubbing, installing a cofferdam and dewatering the site, excavation for riprap placement, H-Pile installation, roadway subbase and aggregate work, and riprap armoring. This is a significant construction project for firms experienced in bridge building and related civil works.
Key dates and what happens at the deadline
This solicitation was published on July 15, 2026. All proposals must be submitted by August 12, 2026, at 2:00 PM ET. It is important to submit your proposal on time, as late submissions are generally not considered.
The deadline marks the close of the bidding period. After this, the Forest Service will review all submitted proposals to select a contractor for the bridge construction.
Who this opportunity suits
This opportunity is suitable for construction firms with experience in bridge building, particularly those familiar with steel girder and timber deck structures. Companies with expertise in site preparation, excavation, erosion control, and pile driving will find this project aligns with their capabilities.
The project is categorized under construction, making it relevant for small businesses in the civil engineering and heavy construction sectors. Firms that have previously worked on infrastructure projects in challenging or natural environments may also be well-suited.
How to respond to this solicitation
To access the full details of this opportunity, click the “View original source” link. If the first click takes you to the portal’s homepage, click the link again to go directly to the bid.
You may need to create a free account on the portal to view all the solicitation documents. However, for some bids, an account is not required to access the information.
Tips for a competitive response
When preparing your proposal, focus on demonstrating your firm's specific experience with bridge construction, especially projects involving steel and timber components. Highlight any past work that included similar tasks such as cofferdam installation, H-Pile driving, or riprap armoring.
Clearly outline your proposed approach to each phase of the project, from site preparation to final installation. Provide a detailed schedule and demonstrate your capacity to meet the project timeline. Ensure your pricing is competitive and accurately reflects the scope of work described in the solicitation.
See the live bid — deadline, agency details, and how to respond
Dates and requirements can change via addenda; always verify on the bid page and at the original source before responding.
View this bid on BiddingSimpleThis guide was prepared by BiddingSimple from the solicitation’s public posting. It is not official guidance from Forest Service; the original posting controls.