What the City of Carrollton is buying
The City of Carrollton is seeking a contractor to reconstruct Johnson Avenue from Rome Street to Barnes Avenue, and a section of Barnes Avenue. This project involves significant infrastructure work, including new storm sewer piping, sanitary sewer mains, and water mains. It also covers reconnecting existing services, relocating utilities, and demolishing existing road and parking lot sections.
The scope extends to milling and overlaying parts of the existing road, installing new full-depth pavement, curb and gutter, and sidewalks. A retaining wall will be installed, and the roadway and parking lots will be restriped and resigned. Traffic control, erosion control, and permanent stabilization are also part of the work. Contractors must coordinate closely with the City Engineer and utility owners, minimizing road and parking lot closures during construction.
Key dates and what happens at the deadline
This solicitation was published on July 10, 2026. The deadline for submissions is August 11, 2026, at 10:00 AM ET. All responses must be submitted before this time.
An optional pre-bid meeting will be held on July 28, 2026, at 10:00 AM ET. This meeting will take place at Carrollton City Hall, located at 315 Bradley St, Carrollton. Attending this meeting can provide valuable insights and an opportunity to ask questions directly.
Who this opportunity suits
This opportunity is suitable for construction firms with experience in comprehensive road reconstruction and utility installation. This includes expertise in stormwater management, sanitary sewer systems, water main installation, paving, and sidewalk construction. Firms capable of managing complex projects with multiple phases and coordinating with various stakeholders will find this a good fit.
The project requires a contractor who can manage traffic control and minimize disruptions to public access during construction. Experience with retaining wall installation and erosion control is also relevant. This is a significant infrastructure project for a general construction contractor.
How to respond
To access the full solicitation documents and learn how to respond, you need to go to the Georgia Procurement Registry (GPR). You can view the posting and its associated documents publicly without needing an account.
Once on the GPR, check if the event routes documents and responses to an external “Event Link” (Team Georgia Marketplace). If it does, follow the instructions on that external link. Otherwise, submit your response as directed on the GPR posting itself, ensuring it is submitted before the August 11, 2026, 10:00 AM ET deadline.
Tips for preparing a competitive response
Carefully review all project specifications, especially those related to utility coordination and road closures. Highlight your firm's experience with similar multi-faceted construction projects, particularly those involving both road reconstruction and extensive utility work. Provide clear examples of past projects where you successfully managed traffic flow and minimized public disruption.
Pay close attention to the coordination requirements with the City Engineer and utility owners. Detail your proposed communication plan and coordination strategies. If you attended the optional pre-bid meeting, incorporate any insights gained into your proposal. Ensure your bid addresses all aspects of the scope, from demolition and installation to final stabilization and striping, demonstrating a comprehensive understanding of the project's demands.
See the live bid — deadline, agency details, and how to respond
Dates and requirements can change via addenda; always verify on the bid page and at the original source before responding.