Bid guide
How to bid on Green River Lock and Dam Security Lighting for the DEPT of the Army
What the Army Corps of Engineers is buying
The Department of the Army is seeking a contractor to install security lighting and related power infrastructure at Green River Lock and Dam #1 in Reed, Kentucky. This project involves furnishing and installing 16 security lights, 8 utility poles, and the necessary power supply.
This is a construction opportunity, specifically for electrical work, and is set aside entirely for small businesses. Firms in this category should review the solicitation carefully.
Key dates and deadlines
The solicitation was published on July 23, 2026. All quotes must be submitted by August 10, 2026, at 1:00 PM Eastern Time. It is crucial to submit your quote before this deadline, as late submissions are generally not accepted.
Who this opportunity suits
This opportunity is a 100% small business set-aside, making it suitable for small businesses specializing in electrical installation or general construction with electrical capabilities. The NAICS code for this procurement is 238210, which covers electrical contractors, with a size standard of $19 million. Eligible bidders must have an active registration in the System for Award Management (SAM) database.
How to respond
To access the solicitation, you will need to view the original source on the federal business opportunities portal. If the first click takes you to the homepage, click the link again to go directly to the bid. You may need a free account on the portal to view the full documents, though this is not always required.
The solicitation and any amendments will be available for download in PDF format. Telephone and fax requests for the solicitation will not be honored. Questions about the solicitation may be addressed through ProjNet.
Practical tips for preparing your response
Ensure your SAM registration is active and up-to-date before the quote submission deadline. An inactive registration can disqualify your bid. Carefully review the attached scope of work and all terms, clauses, and conditions to ensure your quote fully complies with all requirements.
Since this is a construction project involving electrical installation, pay close attention to specifications for materials, equipment, and personnel qualifications. Clearly detail how your firm will meet each aspect of the scope of work. Double-check all calculations and pricing before submission.
See the live bid — deadline, agency details, and how to respond
Dates and requirements can change via addenda; always verify on the bid page and at the original source before responding.
View this bid on BiddingSimpleThis guide was prepared by BiddingSimple from the solicitation’s public posting. It is not official guidance from DEPT of the Army; the original posting controls.
