Bid guide
How to bid on House 113 Repairs for the Georgia Department of Corrections
What the agency is buying
The Georgia Department of Corrections needs a contractor to perform repairs on House 113. This work is required due to damage caused by Hurricane Helene. This is an opportunity for construction firms to work with a state agency on a specific repair project.
Key dates and deadlines
This Request for Quote (RFQ) was published on August 03, 2026. A mandatory pre-bid meeting will be held on August 18, 2026, at 8:00 AM ET at Georgia State Prison in Reidsville. All bids must be submitted electronically by September 03, 2026, at 2:00 PM ET. Missing the pre-bid meeting will disqualify your firm from bidding.
Who this opportunity suits
This opportunity is suitable for construction firms experienced in repair work, particularly those familiar with hurricane damage remediation. Firms in the construction category with the capacity to undertake repairs for a state facility should consider this bid.
The project is located in Georgia, and firms with local presence or experience working in the state may find this advantageous.
How to respond
To access the full solicitation documents, you need to view the original posting on the Georgia Procurement Registry (GPR). You do not need an account to view the posting and its document list.
Electronic bids will be accepted through GSFIC’s e-Builder system. The Invitation to Bid document and the e-Builder Registration & Bid Submittal User Guide, available on the GPR posting, provide detailed instructions on this process. Ensure you attend the mandatory pre-bid meeting to be eligible to submit a bid.
Tips for a competitive response
Since attendance at the pre-bid meeting is mandatory, make sure to send a representative who can gather all necessary information and ask clarifying questions. This meeting is crucial for understanding the full scope of work and site conditions.
Carefully review all bidding and contract documents provided through the e-Builder system. Pay close attention to the specific repair requirements for House 113 and ensure your bid accurately reflects the costs and timeline for these services. Double-check all submission requirements for the e-Builder system to avoid any technical issues or disqualifications.
See the live bid — deadline, agency details, and how to respond
Dates and requirements can change via addenda; always verify on the bid page and at the original source before responding.
View this bid on BiddingSimpleThis guide was prepared by BiddingSimple from the solicitation’s public posting. It is not official guidance from Georgia Department of Corrections; the original posting controls.
