Bid guide

How to bid on the FY27 CD Fayette Storage Bay Project for the State of Missouri

State of Missouri MOCloses September 1, 2026

What the agency is buying

The State of Missouri, through its Department of Transportation (MoDOT), is seeking bids for the construction of a storage structure. This project involves building a 50-foot-deep by 24-foot-wide facility in Fayette, Missouri. The structure will feature 2x8 exterior perimeter wood stud walls and will be built on a concrete foundation and footings.

This is an opportunity for construction firms to secure a contract with the State of Missouri for a defined building project.

Key dates and deadlines

The solicitation was published on July 23, 2026. All bids must be submitted by September 01, 2026, at 3:00 PM ET. It is mandatory to attend the pre-bid meeting for your bid to be considered. If you plan to submit a hard copy bid, you must email the buyer of record five business days before the bid closing date.

Who this opportunity suits

This Invitation for Bid (IFB) is suitable for construction companies with experience in building wood-frame structures and concrete foundations. Firms specializing in commercial or public building construction, particularly those familiar with state government projects, would find this opportunity relevant. The project falls under the general construction category.

How to respond

To access the full solicitation documents and respond, you need to go to the State of Missouri's Oracle procurement portal. You can view the negotiation's public abstract directly on the portal. Review the summary, lines, and listed documents there. If you see an abstracts list, search for negotiation number MODOT 0000000361SL.

To download documents or submit a bid, you must register a free supplier account on the Oracle portal. Bids can be submitted electronically through MissouriBUYS or by mail, UPS, or FedEx. Remember, attendance at the pre-bid meeting is mandatory for your bid to be accepted. If submitting a hard copy, email Logan Wilbers at [email protected] five business days before the closing date.

Tips for a competitive response

Carefully review all six attachments provided with the solicitation to understand the full scope and specifications. Pay close attention to the requirements for the wood stud walls, concrete foundation, and footings. Ensure your proposal clearly demonstrates your firm's capability to meet these specific construction details.

Since a pre-bid meeting is mandatory, make sure to attend. This is your opportunity to ask questions directly to the agency and gain insights that can help you refine your bid. Also, if you are submitting a hard copy, adhere strictly to the five-business-day email notification requirement to avoid any issues with your submission.

See the live bid — deadline, agency details, and how to respond

Dates and requirements can change via addenda; always verify on the bid page and at the original source before responding.

View this bid on BiddingSimple

This guide was prepared by BiddingSimple from the solicitation’s public posting. It is not official guidance from State of Missouri; the original posting controls.