Bid guide

How to bid on Electric Power Distribution System Upgrade at Janes Island State Park for MES

Maryland Environmental Service (MES) MDCloses August 19, 2026

What the agency is buying

The Maryland Environmental Service (MES) is looking for bids to upgrade the electric power distribution system at Janes Island State Park. This is a construction opportunity for vendors in the electrical or general construction sector.

This project is important for maintaining and improving the infrastructure of a state park. Vendors should note the 15% Minority Business Enterprise (MBE) requirement, which means a portion of the work must be performed by certified MBE firms.

Key dates and deadlines

The deadline for submitting bids for this solicitation is August 19, 2026, at 5:00 PM ET. All responses must be submitted by this time.

It is crucial to submit your bid before the deadline. Late submissions are typically not accepted. Plan to finalize and upload your documents well in advance to avoid any last-minute technical issues.

Who this opportunity suits

This opportunity is suitable for construction firms with expertise in electrical power distribution systems. Companies specializing in infrastructure upgrades, particularly in park or public utility settings, would be a good fit.

Given the 15% MBE requirement, this is also a strong opportunity for certified Minority Business Enterprises, or for prime contractors looking to partner with MBE firms to meet the set-aside goal. The relevant category is construction.

How to respond

To access the full solicitation documents and submit your response, you need to use the MES Bonfire procurement portal. The reference number for this opportunity is 1-26-2-12-5R.

You can view the opportunity details publicly without an account. However, to download the solicitation files and submit your bid, you will need to register a free vendor account on the Bonfire portal. Complete your registration early to ensure you have full access to all necessary features before the deadline.

Tips for a competitive response

When preparing your bid, carefully review all requirements, especially those related to the electric power distribution system upgrade. Ensure your proposal clearly demonstrates your firm's experience and capability in similar projects.

Pay close attention to the 15% MBE requirement. If you are a prime contractor, outline your plan for engaging certified MBE subcontractors. If you are an MBE firm, highlight your certification and relevant experience. Double-check that all required forms and documentation are included and accurately completed before submission.

See the live bid — deadline, agency details, and how to respond

Dates and requirements can change via addenda; always verify on the bid page and at the original source before responding.

View this bid on BiddingSimple

This guide was prepared by BiddingSimple from the solicitation’s public posting. It is not official guidance from Maryland Environmental Service (MES); the original posting controls.