Bid guide
How to bid on Construct TOC Pad - Arlington Heights IL - Pre for DEPT of Defense
What the agency is buying
The Department of Defense needs a contractor to build a Tactical Operation Center (TOC) Pad at the 88th USARC in Arlington Heights, Illinois. This project involves several construction tasks.
The work includes excavation and storage of spoils, demolition and installation of electrical power distribution, directional boring of telecom lines, and installation and leveling of gravel. This is a chance for a small business to secure a government construction contract.
Key dates and deadlines
This solicitation was published on August 07, 2026. All bids must be submitted by September 09, 2026, at 12:00 PM ET. It is important to submit your bid through the PIEE system before this deadline.
Who this opportunity suits
This opportunity is a competitive 8(a) set-aside Invitation for Bid. It is specifically for small businesses that are part of the 8(a) program and have experience in construction, particularly with excavation, electrical work, directional boring, and gravel installation.
How to respond
To access the solicitation, click “View original source” to open the opportunity on the portal. If the first click takes you to the portal’s homepage, click it again to go directly to the bid. You may need a free account to view documents, though sometimes it is not required.
All bids MUST BE SUBMITTED in the PIEE system. If your company does not already have a PIEE account, you will need to create one to submit your bid. Make sure to download all three files to complete your solicitation package before reviewing and submitting your bid.
Tips for preparing a competitive response
When preparing your bid, carefully review all solicitation documents to ensure full compliance with all requirements. Pay close attention to the scope of work, including details on excavation, electrical, telecom, and gravel installation.
Ensure your pricing is competitive and accurately reflects the cost of materials, labor, and equipment for each task. Highlight your company's experience with similar construction projects, especially those involving the specific tasks outlined in the solicitation. Double-check all submission requirements for the PIEE system well in advance of the deadline.
See the live bid — deadline, agency details, and how to respond
Dates and requirements can change via addenda; always verify on the bid page and at the original source before responding.
View this bid on BiddingSimpleThis guide was prepared by BiddingSimple from the solicitation’s public posting. It is not official guidance from DEPT of Defense; the original posting controls.
